Goblin powers
How he spreads the revision.
The goblin’s favorite trick is making a community-wide impact sound like a quick mark-up.
Power 01
Curb shuffle
Moves a curb, driveway, sidewalk, or entry detail and wakes grading, drainage, civil drawings, and field layout.
Power 02
Utility ripple
Shifts a utility corridor, sleeve, transformer, lateral, crossing, or service point and invites the Trench Serpent.
Power 03
Lot-line mischief
Touches setbacks, easements, fences, pads, drainage, buyer expectations, and sometimes the survey team’s blood pressure.
Power 04
Model option fog
Changes options, elevations, packages, or standards while sales, purchasing, and production try to keep one story.
Power 05
Permit echo
Makes revised drawings bounce through planning, building, fire, public works, utilities, or internal review.
Power 06
Closing tremor
Turns “small revision” into delayed starts, inspection shifts, buyer confusion, or closing pressure.